• Follow
  • Follow
  • Follow
  • Follow
  • Home
  • Products
    • Commercial Marina Systems
    • Docks & Platforms
    • Wave Attenuators
  • Materials
    • Aluminum Systems
    • Steel Systems
    • Timber Systems
  • About Us
  • News
  • Contact Us
  • Schedule A Consultation
  • Make A Payment
  • Careers
Rochester Yacht Club Renovation Completed In Time For Summer 2020

Rochester Yacht Club Renovation Completed In Time For Summer 2020

by kiaoihituabfkd9 | Sep 11, 2020 | Latest Press Releases

McAlester, OK — Meeco Sullivan announces the completion of the latest renovation at Rochester Yacht Club. Residing on the Genesee River at the south shoreline of Lake Ontario, Rochester Yacht Club has a large area of slips for both members and visitors. The...
Rochester Yacht Club Renovation Completed In Time For Summer 2020

Cape Cod Boaters Enjoy New Meeco Sullivan Timber Docks

by Judianne Ambrosio | Aug 10, 2020 | Latest Press Releases

[fusion_builder_container hundred_percent=”no” hundred_percent_height=”no” hundred_percent_height_scroll=”no” hundred_percent_height_center_content=”yes” equal_height_columns=”no” menu_anchor=””...
Rochester Yacht Club Renovation Completed In Time For Summer 2020

Meeco Sullivan’s 18+ Year Partnership with Cottonwood Creek Marina Continues with Addition of D Dock

by kiaoihituabfkd9 | Apr 9, 2020 | Latest Press Releases

[fusion_builder_container hundred_percent=”no” hundred_percent_height=”no” hundred_percent_height_scroll=”no” hundred_percent_height_center_content=”yes” equal_height_columns=”no”...
Rochester Yacht Club Renovation Completed In Time For Summer 2020

Senior Sales & Marketing Executive Hired as VP, National Sales Manager

by admin | Aug 21, 2019 | Latest Press Releases

Warwick, NY—Meeco Sullivan announced the hiring of Dennis Wilson as Vice President, National Sales Manager effective August 5, 2019. Peter Ladouceur, President of Meeco Sullivan, noted “We are very pleased to have a sales leader of Dennis’ caliber join our management...
Rochester Yacht Club Renovation Completed In Time For Summer 2020

Steve Sullivan Retires After 38 Years

by kiaoihituabfkd9 | Feb 6, 2019 | Latest Press Releases

Warwick, NY— After helping lead and grow the company for the past 38 years, Meeco Sullivan announced Steve Sullivan’s retirement as President and CEO. Steve will continue to support and advise the company as a member of the Meeco Sullivan/Wahoo Advisory Board....
Rochester Yacht Club Renovation Completed In Time For Summer 2020

Harbor East Relies on Meeco Sullivan to Help Revitalize Baltimore’s Inner Harbor

by admin | Nov 2, 2018 | Latest Press Releases, Uncategorized

Warwick, NY—Senior VP of National Sales for Meeco Sullivan, announced the recent completion of Baltimore’s newly renovated Harbor East Marina. Harbor East is a 180-slip marina with over 900 ft. of alongside dockage for larger yachts and is located in the heart of the...
« Older Entries
Next Entries »

Recent Posts

  • Meeco Sullivan Delivers Timber Marina for LakeShore Towers on Lake Michigan in Racine, WI
  • A Long-Awaited Vision Becomes Reality: Savannah Harbor Marina Project
  • Meeco Sullivan Completes Dock Project at the U.S. Naval Academy in Annapolis
  • Meeco Sullivan Partners with The National Aquarium to Bring Living Wetlands to Life
  • Lighthouse Point Marina’s Remarkable Overhaul

Recent Comments

No comments to show.

Need help with marina design? Have questions about materials? Want to talk about your budget or timeline? Contact us now! We’d love to help.

Call To Schedule A Consultation

800-232-3625

Schedule Now

Meeco Facility
1501 E. Electric Ave.
McAlester, OK 74501

Sullivan Facility
3 Chancellor Lane
Warwick, NY 10990

Wahoo Facility
203 Chesterra Dr.
Dahlonega, GA 30533

Ravens Facility
3295 Orange Ave.
Kissimmee, FL 34744

Copyright 2025 Meeco Sullivan . View Our Privacy Policy

×

Sullivan Light Duty Wave Wall

  • Constructed with Sullivan HD design
  • Metal connection brackets create stability and add strength
  • Diagonal steel reinforcement from wall leg to center beam
  • Stainless steel exterior lag bolts – prevent rust
  • Truss system hidden by 2”x10” outer members

Sullivan Wave Attenuators

  • Attenuator boxes
  • 5 timber beams or 7 timber beams tall
  • Frames built from (2) 2”x10” laminated
    structural timber beams
  • Floats incorporated into upper frame

Five Timber Beams Fully Assembled

  • 3 sections connected by box-to-box connection plates
  • 6 bolt truss tabs tie WA box to upper frame, reinforced with outside washer plates

Attenuator Box

  • Diagonal wood bracing secures and
    strengthens box timber members
  • Inside steel legs bolt through to outside
    steel angle box legs

Galvanized Structural Steel Truss Frame

  • Struts along top and bottom
  • Diagonal struts tie box legs to truss and provides support for wall boards
  • Truss design creates torsional rigidity
  • Resists unforgiving wave action

5 Timber Member WA w/ Upper Frame & Decking

  • Splice block connection when wave attenuator is
    constructed of multiple boxes.
  • Steel angle outside box legs extended to connect to upper frame
  • Steel truss tabs between box legs connect to upper frame
  • Step leg design aligns splice member

Sullivan Wave Attenuator Assembly

Integrated truss tabs stick upwards to attach the box truss to the dock frame

Sullivan HD frame, constructed with 2”x10” beams and preinstalled floats, is attached to the top of the attenuator box

Tab to tab center brace reinforces beams on each side of box

Internal pile guides are built into the frame,
with pile rollers and decking installed last

Completed attenuator boxes prepared for shipping

How Sullivan Wave Attenuators Work

Attenuator walls and box truss sit mostly below water level

Sullivan HD timber frame and floats attach to the top of the boxes

Surface fully decked as a useable dock