• Follow
  • Follow
  • Follow
  • Follow
  • Home
  • Products
    • Commercial Marina Systems
    • Docks & Platforms
    • Wave Attenuators
  • Materials
    • Aluminum Systems
    • Concrete Systems
    • Steel Systems
    • Timber Systems
  • About Us
  • News
  • Contact Us
  • Schedule A Consultation
  • Make A Payment
  • Careers
Stutts Marina: A Staple of Lake Norman

Stutts Marina: A Staple of Lake Norman

by Katie Whitmore | Mar 17, 2021 | Latest Press Releases

Stutts Marina, located on Lake Norman in Mooresville, North Carolina, is a lakeside staple for the area. Originally opening in 1963, Stutts has since changed hands to its current owners who have renovated and solidified its position as the finest marina on Lake...
Dover Bay Marina Continues Long Relationship with Meeco Sullivan

Dover Bay Marina Continues Long Relationship with Meeco Sullivan

by Katie Whitmore | Feb 15, 2021 | Latest Press Releases

McAlester, OK- Meeco Sullivan announces the recent completion of the “E Dock” at Dover Bay Resort Marina, located on Lake Pend Oreille in northern Idaho. The Dover Bay Marina has become a popular destination for boaters, as it sits on 285 acres of waterfront access....
Meeco Sullivan Sponsors End-of-Summer Boating Concert

Meeco Sullivan Sponsors End-of-Summer Boating Concert

by Katie Whitmore | Sep 24, 2020 | Latest Press Releases

Meeco Sullivan was proud to sponsor the Dana Bolton Flotilla Concert at the Community Sailing Center in Burlington, Vermont on September 5, 2020. The concert was a memorial to honor the life of a beloved volunteer, instructor, and board member of the Community Sailing...
Cape Cod Boaters Enjoy New Meeco Sullivan Timber Docks

Cape Cod Boaters Enjoy New Meeco Sullivan Timber Docks

by Katie Whitmore | Aug 10, 2020 | Latest Press Releases

[fusion_builder_container hundred_percent=”no” hundred_percent_height=”no” hundred_percent_height_scroll=”no” hundred_percent_height_center_content=”yes” equal_height_columns=”no” menu_anchor=””...
Cape Cod Boaters Enjoy New Meeco Sullivan Timber Docks

Senior Sales & Marketing Executive Hired as VP, National Sales Manager

by Katie Whitmore | Aug 21, 2019 | Latest Press Releases

Warwick, NY—Meeco Sullivan announced the hiring of Dennis Wilson as Vice President, National Sales Manager effective August 5, 2019. Peter Ladouceur, President of Meeco Sullivan, noted “We are very pleased to have a sales leader of Dennis’ caliber join our management...
« Older Entries
Next Entries »

Recent Posts

  • Supporting America’s Maritime Legacy at Sail250
  • MEECO SULLIVAN EXPANDS DOCK PORTFOLIO WITH THE ADDITION OF S&S PRECAST 
  • Built to Perform: Partnering with Brothers Construction
  • From Shoreline to Harbor: Bear Lake’s New Marina Takes Shape
  • Big or Small, Meeco Sullivan Builds Them All

Recent Comments

No comments to show.

Need help with marina design? Have questions about materials? Want to talk about your budget or timeline? Contact us now! We’d love to help.

Call To Schedule A Consultation

800-232-3625

Schedule Now

McAlester Facility
1501 E. Electric Ave.
McAlester, OK

Warwick Facility
3 Chancellor Lane
Warwick, NY

Dahlonega Facility
203 Chesterra Dr.
Dahlonega, GA

Kissimmee Facility
3295 Orange Ave.
Kissimmee, FL

Bonita Springs Facility
25095 Old 41 Rd.   Bonita Springs, FL

Copyright 2026 Meeco Sullivan . View Our Privacy Policy

Form 1095-C provides information about the health insurance coverage we offered you during the year.

Employees/Former Employees – Request Your Form 1095-C:

If you would like to receive your Form 1095-C in the mail for the current tax year, you can request the form by:

    • Emailing us at:  hr@meecosullivan.com

    • Calling us at: 1-866-612-1976

Forms are also available on your personal employee Workday portal

×

Sullivan Light Duty Wave Wall

  • Constructed with Sullivan HD design
  • Metal connection brackets create stability and add strength
  • Diagonal steel reinforcement from wall leg to center beam
  • Stainless steel exterior lag bolts – prevent rust
  • Truss system hidden by 2”x10” outer members

Sullivan Wave Attenuators

  • Attenuator boxes
  • 5 timber beams or 7 timber beams tall
  • Frames built from (2) 2”x10” laminated
    structural timber beams
  • Floats incorporated into upper frame

Five Timber Beams Fully Assembled

  • 3 sections connected by box-to-box connection plates
  • 6 bolt truss tabs tie WA box to upper frame, reinforced with outside washer plates

Attenuator Box

  • Diagonal wood bracing secures and
    strengthens box timber members
  • Inside steel legs bolt through to outside
    steel angle box legs

Galvanized Structural Steel Truss Frame

  • Struts along top and bottom
  • Diagonal struts tie box legs to truss and provides support for wall boards
  • Truss design creates torsional rigidity
  • Resists unforgiving wave action

5 Timber Member WA w/ Upper Frame & Decking

  • Splice block connection when wave attenuator is
    constructed of multiple boxes.
  • Steel angle outside box legs extended to connect to upper frame
  • Steel truss tabs between box legs connect to upper frame
  • Step leg design aligns splice member

Sullivan Wave Attenuator Assembly

Integrated truss tabs stick upwards to attach the box truss to the dock frame

Sullivan HD frame, constructed with 2”x10” beams and preinstalled floats, is attached to the top of the attenuator box

Tab to tab center brace reinforces beams on each side of box

Internal pile guides are built into the frame,
with pile rollers and decking installed last

Completed attenuator boxes prepared for shipping

How Sullivan Wave Attenuators Work

Attenuator walls and box truss sit mostly below water level

Sullivan HD timber frame and floats attach to the top of the boxes

Surface fully decked as a useable dock